About us - Others talk about full service, we offer it.

Document as PDF Exposé in Deutsch | English | Français | Nederlands | Polskie | Русский | Svenska Document as PDF

Company form mould design and construction  

  • Building Modell Technik

  • Building Modell Technik

    Rheinmetall AG

    Leibfried-Mahle

    Formerly known as Modell Technik GmbH mould design and construction limited partnership (1993)

    July 2012 to December 2020 a company of GESCO AG

Others talk about full service, we offer it!  

Consultation, product development, mould design
REVERSE ENGINEERING and simulation
Production with modern machinery

Die cast molds / injection molds up to 48 t max weight

Laboratory foundry with three casting machines
(400 t / 1.250 t / 2.300 t)
Pre-serial tools

Small series production from aluminum alloys

3D measuring of casting parts (optical & tactile)

Performing mold maintenance and repair

Production of spare parts





... alles aus einer Hand

Mike Ziesemann

Mike Ziesemann
managing director

Steffen Meiß

Steffen Meiß
leader of sales manager

Meik Bley

Meik Bley
sales manager national


Thomas Wille

Thomas Wille
leader of production

Axel Brodmann

Axel Brodmann
leader construction & development

Thomas Seidelbach

Thomas Seidelbach
master


Martina Pamin

Martina Pamin
secretariat

Simone Wieprecht

Simone Wieprecht
assistant management

Martin Hoffmann

Martin Hoffmann
leader purchasing

Armin Opitz

Armin Opitz
logistics & purchasing

Contact us.  

Modell Technik

Modell Technik

Name [required field]

E-mail address [required field]

Subject

Message [required field]

On our website we offer you the possibility to contact us via contact form. In this case, the information provided by the user will be stored for the purpose of processing his contact. The data will not be passed on to third parties. A comparison of the data collected in this way with data that may possibly be collected by other components of our site does not take place either.
See below for all details on [ Imprint / Privacy ].

Mould  


1997

2000

2011

today:

1st step: new building

2nd step: additional building

3nd step: new assembly hall

4100 m² production area
1350 m² office-sanitary area
highly qualified employees





die cast molds / injection molds up to 48 t max weight

pre-serial tools, flow pattern and solidification simulation with Flow-3D, laboratory foundry with three casting machines (400 t / 1.250 t / 2.300 t)…